The following guide specifications are intended to be reviewed, modified and inserted into the noted specification section to meet the specific commissioning needs and requirements for the current project. Any modifications to these specifications shall only be made after consultation with the Owner’s representative and with approval of the engineer of record. Where there are check boxes or fill-in blanks, fill in as appropriate and delete all but the choice(s) that apply. Delete all direction boxes.

This language is for the O&M data. The Spec Writer should coordinate this language with any more holistic  project closeout documentation required for the entire project such as the OPR, as-builts, record drawings and specifications, change orders, submittals, training materials, commissioning record, etc.